Chapter 4
4-19
3) Remove the belt [1], E-ring [2], gear [3], parallel
pin [4], and plate [5].
F-4-74
4) Remove the ball bearing [1], washer [2]; E-ring
[3], and ball bearing [4].
F-4-75
5) Remove the ball bearing [1] in downward
direction, detaching the delivery roller [2] at the
same time.
F-4-76
6) Detach the E-ring [2] and the ball bearing [3] from
the stack delivery roller [1].
F-4-77
[1]
[2]
[3]
[4]
[5]
[1]
[2]
[2]
[4]
[3]
[1]
[2]
[1]
[2]
[3]
Summary of Contents for Finisher-AB1
Page 9: ...Chapter 1 SPECIFICATIONS ...
Page 16: ...Chapter 2 INSTALLATION ...
Page 33: ...FUNCTIONS Chapter 3 ...
Page 71: ...PARTS REPLACEMENT PROCEDURE Chapter 4 ...
Page 104: ...MAINTENANCE Chapter 5 ...
Page 170: ...Chapter 5 5 64 5 5 3 Solenoids Finisher Unit 0015 2251 F 5 185 SL3 SL2 SL1 SL4 SL5 SL6 SL8 ...
Page 179: ...ERROR CODE Chapter 6 ...
Page 192: ...APPENDIX ...
Page 202: ......
Page 212: ...Chapter 1 SPECIFICATIONS ...
Page 220: ...Chapter 2 INSTALLATION ...
Page 237: ...FUNCTIONS Chapter 3 ...
Page 239: ...Contents 3 8 1 Overview 3 51 3 8 2 Protective Mechanism 3 52 ...
Page 292: ...PARTS REPLACEMENT PROCEDURE Chapter 4 ...
Page 346: ...MAINTENANCE Chapter 5 ...
Page 422: ...Chapter 5 5 74 5 5 3 Solenoids Finisher Unit 0015 2251 F 5 216 SL3 SL2 SL1 SL4 SL5 SL6 SL8 ...
Page 438: ...ERROR CODE Chapter 6 ...
Page 451: ...APPENDIX ...
Page 463: ......