INSTRUCTIONAL MANUAL
2750L-P/4500L-P/6000L-P
August, 2001
Rev. K
-126-
MIL704D[A][B][C]
:EMERgency
This test will combine the voltage emergency test and the frequency emergency test. A pause of 5
seconds between tests is asserted.
8.6.5 MIL704D
TEST
MIL704D[A][B][C]
This test will combine all the tests listed above in one test in the sequence listed. A 5 second time
delay separate the parts of the test. Tests will be performed on the selected phases only.
Summary of Contents for 12000L-1P
Page 119: ...INSTRUCTIONAL MANUAL 2750L P 4500L P 6000L P August 2001 Rev K 115 Figure 6 1 MODULE LOCATION...
Page 138: ...INSTRUCTIONAL MANUAL 2750L P 4500L P 6000L P August 2001 Rev K 134 Figure 14 EMERGENCY VOLTAGE...
Page 148: ...INSTRUCTIONAL MANUAL 2750L P 4500L P 6000L P August 2001 Rev K 144 FIGURE 2...