INSTRUCTIONAL MANUAL
2750L-P/4500L-P/6000L-P
August, 2001
Rev. K
-125-
3.
Abnormal voltage test
MIL704D[A][B][C]
:ABNormal
:VOLTage
This test will combine Abnormal overvoltage and Abnormal undervoltage. There will be a pause of 5
seconds between tests. If the voltage range is below 180 volts the Abnormal overvoltage test will not
take place.
4.
Abnormal overfrequency test (Figure 12)
MIL704D
:ABNormal
:FREQuency
:OVER
This test will step up the frequency from 400 Hz to 480 Hz. The frequency will step down to 400 Hz in
the following sequence:
480
Hz
for
5
seconds
425
Hz
for
5
seconds
5.
Abnormal underfrequency test (Figure 13)
MIL704D
:ABNormal
:FREQuency
:UNDer
This test will step down the frequency from 400 Hz to 0 Hz. The frequency will step up to 400 Hz in
the following sequence:
0
Hz
for
5
seconds
375
Hz
for
5
seconds
6.
Abnormal frequency test
MIL704D
:ABNormal
:FREQuency
This test will combine the Abnormal overfrequency and the Abnormal underfrequency . There is a
pause for 5 seconds between tests.
8.6.4. EMERGENCY
1.
Emergency voltage test (Figure 14).
MIL704D[A][B][C]
:EMERgency
:VOLTage
This test will step down the voltage to 104 volts for 5 seconds. Also it will step up the voltage to 122
volts for another 5 seconds.
2.
Emergency frequency test (Figure 15).
MIL704D
:EMERgency
:FREQuency
This test will step down the frequency to 360 Hz for 5 seconds then will step up the frequency to 440
Hz for 5 seconds.
3.
Emergency
test
Summary of Contents for 12000L-1P
Page 119: ...INSTRUCTIONAL MANUAL 2750L P 4500L P 6000L P August 2001 Rev K 115 Figure 6 1 MODULE LOCATION...
Page 138: ...INSTRUCTIONAL MANUAL 2750L P 4500L P 6000L P August 2001 Rev K 134 Figure 14 EMERGENCY VOLTAGE...
Page 148: ...INSTRUCTIONAL MANUAL 2750L P 4500L P 6000L P August 2001 Rev K 144 FIGURE 2...