Service Manual
38 | MN260 B
7.8.2 ATF & COMPRESSOR/PRODUCT TANK INSTALLATION
NOTE: A flow calibration procedure is required after replacing the ATF or Compressor, the PCB Circuit Board, the Proportional Valve. If
any of these components are replaced, flow calibration is required. Flow calibration can be done at a CAIRE authorized service center
or in the field using item T-10560. See manual MN053 for details on performing flow calibration and firmware updates in the field
using item T-10560.
7.8.2.1 Install the ATF Bulkhead Assembly onto the bottom of
ATF Module Assembly as shown in figures below.
ATF bulkhead
(9922-SEQ)
Grommet
(9739-SEQ)
Figure 7-41. ATF Bulkhead
7.8.2.2 Place the ATF Assembly and Compressor Assembly next
to each other and align as shown in figure below.
ATF module assy
(SP9729-SEQ)
ATF bulkhead
assy (9739-SEQ)
Figure 7-42. Align
7.8.2.3 Remove Caps (3575-SEQ) from the ATF. Insert the Ports
from the ATF into the tubes on the Compressor /Tank Assembly.
Press the ATF & Compressor together and ensure that the hoses
are positioned properly.
NOTE: Pre-wet inner tubing on compressor with alcohol. Also, wet
metal barbs on the ATF.
Remove caps
Figure 7-43. ATF caps
NOTE: Use Isopropyl Alcohol to lubricate the Tube and the Barb
and use a Mechanics Grabber Pliers to attach the down pipe hose
from the Compressor Assembly to the fitting on the ATF Module
Assembly.
pliers
Figure 7-44. Down pipe Hose
Grommet
(21495479)
Summary of Contents for SAROS 3000
Page 56: ...Service Manual 56 MN260 B NOTES...