Service Manual
42 | MN260 B
7.8.4.3 Secure the Battery Power wires on the LEFT STRUT (9779-SEQ) with Cable Tie.
NOTE: Leave the Cable Ties loose in case slack is needed at the PCBA assembly.
NOTE: Ensure slack to wires where indicated.
v slack
cable ties
6968-SEQ
Figure 7-54. Secure Battery Wires
Orient the Cable Tie knots towards the Compressor.
7.8.4.4 Secure the ATF Bundled wires to the Battery Power Cables with cable ties.
NOTE: Leave the Cable Ties loose in case slack is needed at the PCBA assembly.
7.8.4.5 Ensure that there is slack on the wires on the areas indicated.
v slack
cable ties 6968-SEQ
Figure 7-55. Slack
7.8.4.6 Install the Grommet onto the Bulkhead to secure the ATF
and Battery wires.
Route the Battery Power wires and Hall Effect wire under the
mounting Compressor screw and through the Bulkhead grommet
as shown in figure below.
Route the ATF wire bundle under the STRUTS prior to rail in-
stallation and through the Bulkhead grommet as shown in figure
below.
NOTE: Do not pinch Thermistor Cable in bulk head.
v slack
ATF power & ATF thermistor
wires from battery connector
compressor
power
hall effect sensor
& battery power wires
thermistor
wires
Figure 7-56. Secure ATF
Summary of Contents for SAROS 3000
Page 56: ...Service Manual 56 MN260 B NOTES...