Service Procedures
PreciseFlex™ DDR Collaborative Robots
P/N: PFD0-DI-00010, Rev 5.0.0, April 9, 2022
110
Copyright © 2022, Brooks Automation, Inc.
Spare Parts Required:
1.
J4 Stage One Belt, PN Gates GT3 Belt 3mm pitch, 564-3M, 15mm wide (PFD0-MC-
X0050)
2.
J4 Stage Two Belt, PN Gates GT3 Belt 5mm pitch, 3MR-564, 25mm wide (PFD0-MC-
X0051)
The user must
1.
Remove the top and bottom covers per above to access the belts.
2.
For the Stage One Belt, loosen the M4 clamping screws, release the belt tension
with the tension set screw, and replace the belt.
3.
For the Stage Two Belt, remove the Stage One Belt per above, then release the belt
tension.
4.
Remove the retaining ring that retains the large idler pulley, remove the idler pulley.
5.
Pulley the Stage Two Belt up over the idler pully shaft, then remove by pulling out
thru the top of the outer link over the output pulley.
6.
Replace parts, re-tension the belts, replace covers.
7.
Recalibrate the robot.