2
-
97
42hw-201601
Chapter 2 enGIne
3015r(h)/3515r(h)/4015r(h)/F36r(h)/F42r(h) traCtOr
2
6.5 enGIne OperatIOn
6.5.1 OperatIOn advanCe preparatIOn wOrk
Fill the new lubricating oil through the filler port.
Connect the coolant hose and fill the coolant.
Connect the fuel hose to fuel tank.
Execute the air bleeding of the fuel line.
1.
2.
3.
4.
6.5.2 enGIne OperatIOn
Because the friction surface is not used enough in case of the new engine, useful life could be shortened due
to overload or over speed in oil film. Therefore must comply with the below.
untIL the FIrSt 50hrS
The engine operates between 1200rpm~1500rpm in no load until the temperature of the engine becomes
normal operation condition.
Avoid the overload or continuous high speed operation.
Avoid the no load high speed operation.
Avoid the sudden acceleration or sudden stop of the engine.
Must comply with check and inspection procedure.
1.
2.
3.
4.
5.
6.5.3 runnInG-In OperatIOn CheCkLISt
Must comply with the following information while the initial running-in operation.
1. Check the lubricating oil level frequently (maintain between the upper limit and lower limit in lubricating oil
level)
2. Check the oil pressure warning lamp. If lamp is lit, lubricating oil shortage or lubrication system is problem.
Therefore must be check.
3. Check the coolant gauge and confirm that whether or not coolant circulate smoothly.
After finishing the running-in operation (50hrs), replace the lubricating oil and oil filter. (Lubricating oil
according to the local characteristics used.)
Summary of Contents for 3015h
Page 6: ......
Page 162: ... BranSOn tractors Co Ltd MEMO ...
Page 172: ... BraNSON tractors Co ltd MEMO ...
Page 278: ... BranSon tractors Co ltd MEMO ...
Page 380: ......
Page 382: ......
Page 384: ......
Page 432: ......
Page 438: ......
Page 447: ...Chapter 8 INDEX ...
Page 454: ... BraNSON tractors Co Ltd MEMO ...