![Brandt GRAIN VAC 5000 Operator And Parts Manual Download Page 35](http://html1.mh-extra.com/html/brandt/grain-vac-5000/grain-vac-5000_operator-and-parts-manual_2801718035.webp)
34
4.4 Service Record
Use this table to record the service work done to the machine. See lubrication section for details of
service.
Table Codes
C - Check
L - Lubricate
4.3 Service Intervals
These service intervals are listed in addition to the
new machine break in items as described in the first
operation section on page 19.
8 Hours or Daily
1. Lubricate the PTO driveline telescoping
members
2. Auger hinge Pivots
3. Fan Idler Pivot
4. Flight Bearings - EX Model only
5. Check fan drive belt tension. See Sec. 5.1.
6. Check auger drive chain tension. See Sec. 5.3
20 Hours or Weekly
1. Lubricate PTO slip clutch. See Fig. 14.
2. Grease main driveline bearings as well as lower
drive bearings and lower flight bearing.
3. Lubricate auger drive chains. A commercial
aerosol chain lube is recommended.
4. Check oil level in Fan Bearing Box.
50 Hours
1. Lubricate PTO Shaft U-Joints.
2. Change Oil in Bearing Box - 150 ml of 75W90
Synthetic Gear Oil
100 Hours or Annually
1. Check wheel bearing tightness, repack if
necessary.
2. Check oil in gearbox.
3. Check the Fan and Housing condition.
Hours
S ervic ed by, Initial
Service Schedule
8 hours or Daily
L P TO Teles coping M em bers
L A uger Hinge P ins
L B elt Idler Hinge P in
L Flight B earings - E X Model Only
C Fan Drive B elt Tension
C A uger Drive Chain Tens ion
20 Hours or W eekly
L P TO S lip Clutc h
L Oil A uger Drive Chain
L B earings on P rimary Drive S haft
L B earing on Lower A uger
C Oil Level in Fan B earing B ox
50 Hours or W eekly
L P TO Universal Joints
Change Oil in B earing B ox
100 Hours or Annually
C Oil Level in Gearbox
Summary of Contents for GRAIN VAC 5000
Page 1: ...OPERATORS AND PARTS MANUAL GRAIN VAC 5000 5000 EX Part No B012352 Rev 15 EffectiveJan 2007...
Page 9: ...8 Thispageisblank...
Page 57: ...56 5 18 PTO Clutch Run In Instructions...
Page 66: ...P 1 GRAIN VAC 5000 PARTS LISTS SERIAL NOS 82000 Present...
Page 67: ...P 2 GRAIN VAC 5000 FRAME ASSEMBLY...
Page 69: ...P 4 GRAIN VAC FAN AND FAN HOUSING ASSEMBLY...
Page 71: ...P 6 GRAIN VAC BODY ASSEMBLY...
Page 73: ...P 8 GRAIN VAC FAN AND AUGER DRIVE SYSTEM...
Page 75: ...P 10 GRAIN VAC 5000 GEARBOX...
Page 77: ...P 12 GRAIN VAC MIDDLE TUBE ASSEMBLY MODEL 5000...
Page 79: ...P 14 GRAIN VAC MIDDLE TUBE ASSEMBLY MODEL 5000 EX...
Page 81: ...P 16 GRAIN VAC UPPER TUBE AND AIRLOCK ASSEMBLY MODEL 5000...
Page 83: ...P 18 GRAIN VAC UPPER TUBE AND AIRLOCK ASSEMBLY MODEL 5000 EX...
Page 86: ...P 21 GRAIN VAC SHIELDS...
Page 89: ...P 24 GRAIN VAC HOSES AND ATTACHMENTS...
Page 91: ...P 26 GRAIN VAC BIN SNAKE AND CLEANUP SHOVEL...
Page 93: ...P 28 2 3 4 5 6 7 8 9 11 12 13 GRAIN VAC HAZARD DECALS 10 Viewfronunderthemachine...
Page 95: ...P 30 GRAIN VAC HOSES AND CLAMPS...
Page 97: ...P 32 GRAIN VAC PTO SHAFT BREAK DOWN Snap Ring Groove is in the Yoke...
Page 101: ...P 36 GRAIN VAC OPTIONAL EQUIPMENT LowerTubeExtension 5000 EX Only...