32
3.13 Storage
Use the following procedure when putting the
Brandt Grain Vac into storage.
1. Wash the entire machine with a water hose or
pressure washer to remove all dirt, mud, debris
and residue.
2. Lubricate all grease points to remove any water
from grease cavities that may remain after
washing.
3. Run the machine slowly for 10 to 15 seconds to
distribute grease to all moving parts. Fold the
auger out and into transport several times to
distribute grease to pivot points.
4. Remove any material that may be hung up on
auger hanger bearing mounts. These are easily
accessed from the ground when the machine is
in transport.
5. Inspect the upper airlock door for any
obstructions. Be sure the door moves freely
and seat properly to ensure a good seal around
all edges.
6. Open the upper body lid and visually inspect
the chaffer decks for obstructions. If the deck
is plugged, remove and clean with a pressure
washer or compressed air.
7. While the body lid is open, open the auger
cleanout door and clean out any grain that may
remain in the vac body. If required, a water
hose can be used from the top to flush any
stubborn material from the body.
8. Check over the hydraulic system and repair or
replace any leaking fittings or damaged hoses.
9. Check the oil level in the gearbox. Add if
required. See Maintenance section.
10. Check the fan drive belt tension and the auger
drive chain tension.
11. Store inside. If it is not possible to store inside,
remove all the suction hoses and store them
inside in a clean, dry environment. The rubber
hose section should be stored flat and straight.
12. When storing the Grain Vac outside for any
length of time, the lower auger cleanout door
should be opened.
Summary of Contents for GRAIN VAC 5000
Page 1: ...OPERATORS AND PARTS MANUAL GRAIN VAC 5000 5000 EX Part No B012352 Rev 15 EffectiveJan 2007...
Page 9: ...8 Thispageisblank...
Page 57: ...56 5 18 PTO Clutch Run In Instructions...
Page 66: ...P 1 GRAIN VAC 5000 PARTS LISTS SERIAL NOS 82000 Present...
Page 67: ...P 2 GRAIN VAC 5000 FRAME ASSEMBLY...
Page 69: ...P 4 GRAIN VAC FAN AND FAN HOUSING ASSEMBLY...
Page 71: ...P 6 GRAIN VAC BODY ASSEMBLY...
Page 73: ...P 8 GRAIN VAC FAN AND AUGER DRIVE SYSTEM...
Page 75: ...P 10 GRAIN VAC 5000 GEARBOX...
Page 77: ...P 12 GRAIN VAC MIDDLE TUBE ASSEMBLY MODEL 5000...
Page 79: ...P 14 GRAIN VAC MIDDLE TUBE ASSEMBLY MODEL 5000 EX...
Page 81: ...P 16 GRAIN VAC UPPER TUBE AND AIRLOCK ASSEMBLY MODEL 5000...
Page 83: ...P 18 GRAIN VAC UPPER TUBE AND AIRLOCK ASSEMBLY MODEL 5000 EX...
Page 86: ...P 21 GRAIN VAC SHIELDS...
Page 89: ...P 24 GRAIN VAC HOSES AND ATTACHMENTS...
Page 91: ...P 26 GRAIN VAC BIN SNAKE AND CLEANUP SHOVEL...
Page 93: ...P 28 2 3 4 5 6 7 8 9 11 12 13 GRAIN VAC HAZARD DECALS 10 Viewfronunderthemachine...
Page 95: ...P 30 GRAIN VAC HOSES AND CLAMPS...
Page 97: ...P 32 GRAIN VAC PTO SHAFT BREAK DOWN Snap Ring Groove is in the Yoke...
Page 101: ...P 36 GRAIN VAC OPTIONAL EQUIPMENT LowerTubeExtension 5000 EX Only...