Installation
13
Final Check Lists
ELECTRICAL CONTROL COMPARTMENT
Applied voltage to unit voltage/phase suitable for
appliance specified.
j
Remove side panel
j
Adjust motor protector to maximum (480V only)
j
Reset high limit thermostats
j
Check fuses
j
Reinstall side panel
PLUMBING FINAL CHECK
j
Incoming water pressure within 40 PSI (miniĆ
mum) Ć 50 PSI (maximum)
j
Water solenoids are properly bracketed and
not leaking
j
24" atmospheric standpipe vent/drain properĆ
ly installed
j
Water feed lines intact without leaks
j
Water pressure regulators installed
j
Spray hose connected properly
Washer
Fill
Solenoid
Hose and Spray
Washer
Regulator Assembly
Y" Fitting
Cold water supply
Spray Hose Connection
Figure 11
OVEN OPERATIONAL TESTS
NOTE: Checks to be made by customer or authoĆ
rized service agent.
Cool Down Mode (if applicable)
j
Turn Switch to COOL DOWN position and
verify that the motor operates with the door
open.
Combi Mode (if applicable)
Turn to COMBI mode, set thermostat to 350
_
F
(177
_
C) and verify:
j
Steam generator flushes and fills
j
Steam generator preheats to 175
_
F (79
_
C)
then switches to hot air
j
When hot air reaches 350
_
F (177
_
C) hot air
shuts off and steam comes on
Steam Mode (if applicable)
Remove control panel, turn to STEAM mode and
verify:
j
Check timer operation in both positions
1. Set timer in position other than ON, timer
should count down
2. Set timer in ON position, oven should opĆ
erate continuously without timer
j
Run light (power light) turns on
j
Unit produces steam, window fogs, door seal
does not leak
j
Quenching system working
Hot Air Mode (if applicable)
Turn to HOT AIR mode and set thermostat to
400
_
F (205
_
C) and verify:
j
Heat demand light is on
j
Oven is heating properly
j
Heat lights shuts off at 400
_
F (205
_
C) and
oven maintains 400
_
F (205
_
C)