18
|
Chapter 2: Installation
6.
Turn the instrument right side up.
7.
Remove the shipping block (
Figure 4
).
Figure 4: Removing the shipping block
Shipping block
8.
Replace the top cover. Turn the instrument upside down and replace
the mounting screws.
9.
Remove the shipping straps from the top of the carrier. Save these for
repackaging/shipping.
Bio-Tek Instruments, Inc.
Summary of Contents for ELx800
Page 1: ...ELx800 Absorbance Microplate Reader Operator s Manual...
Page 2: ......
Page 4: ......
Page 40: ...12 Chapter 1 Introduction Bio Tek Instruments Inc...
Page 66: ...38 Chapter 2 Installation Bio Tek Instruments Inc...
Page 130: ...102 Chapter 3 Operation Bio Tek Instruments Inc...
Page 166: ...138 Chapter 5 Maintenance and Decontamination Bio Tek Instruments Inc...
Page 190: ...162 Appendix B Using 384 Well Geometry Bio Tek Instruments Inc...
Page 193: ...165 Figure 32 Curve Fit Report ELx800 Operator s Manual...
Page 195: ...167 Figure 34 Column Report without samples ELx800 Operator s Manual...
Page 196: ...168 Appendix C Report Format Figure 35 Panel Report Bio Tek Instruments Inc...
Page 197: ...169 Figure 36 Assay Detail Report Sheet 1 of 2 ELx800 Operator s Manual...
Page 200: ...172 Appendix D Comparison of the ELx800 and the EL800 Bio Tek Instruments Inc 172...
Page 214: ...186 Appendix E Instructions for Programming a New Assay Bio Tek Instruments Inc...