9.3
Overview of the drying process
Required measures for operation with solvent-containing substances, which may be able to form an ex-
plosive mixture with air:
Starting situation
•
The vacuum drying oven and additional equipment have been set up and installed in accord-
ance with the instructions in this manual, the instructions of the operator and the relevant
regulations. Equipotential bonding according to the grounding concept is ensured
□
•
The auto-ignition temperature of the solvent has been determined from its safety specifica-
tions
In the case of solvent mixtures, use the lowest auto-ignition temperature.
□
•
All users have been trained and are familiar with the safety plan and the required measures.
□
•
The vacuum source is connected and ready for operation
□
Sweeping the area for electrical equipment and the controller housing (triangle instrument box)
•
Open the USB cover on the controller housing and turn the pressure regulator on the cham-
ber rear until the end stop to the lock nuts for sweeping the electrical installation space and
controller housing
□
•
Sweep the area for electrical equipment and the controller housing at maximum overpressure
with compressed air or inert gas for at least 10 minutes
□
•
Close the USB cover on the controller housing and adjust the pressure regulator by checking
the manometer so that there is at least 25 Pa overpressure (recommendation: 40 Pa).
□
Loading and starting the drying process
•
Make sure that the technical ventilation is activated
□
•
Make sure that equipotential bonding has been established according to the grounding con-
cept
□
•
Make sure that the sweeping time of 10 minutes for the electrical installation area and con-
troller housing have been observed
□
•
Make sure that the compressed air or inert gas supply for sweeping the electrical installation
area and controller housing is still open. Check the excess pressure of at least 25 Pa on the
manometer (recommendation: 40 Pa).
□
•
In case of Standby mode turn on the vacuum drying oven on the controller
□
•
Set the desired temperature setpoint on the controller.
□
•
Set the safety controller to a suitable value.
Recommended setting: safety controller mode: Limit, safety controller value approx. 5 °C
above the temperature set-point
□
•
Make sure that the user's equipment is ESD protected.
•
Place the material to be dried in the chamber.
□
•
Set the pressure set-point on the controller.
Heating will start only when a vacuum corresponding to the pressure threshold of 100 mbar)
is reached.
□
The drying process is running.
Summary of Contents for vdl 115
Page 192: ...VDL E3 1 06 2020 Page 192 206 28 6 Dimensions 28 6 1 VDL 23 Dimensions in mm ...
Page 193: ...VDL E3 1 06 2020 Page 193 206 28 6 2 VDL 56 Dimensions in mm ...
Page 194: ...VDL E3 1 06 2020 Page 194 206 28 6 3 VDL 115 Dimensions in mm ...
Page 198: ...VDL E3 1 06 2020 Page 198 206 ...
Page 199: ...VDL E3 1 06 2020 Page 199 206 ...
Page 200: ...VDL E3 1 06 2020 Page 200 206 31 Product registration ...
Page 207: ......