
VDL (E3.1) 06/2020
Page 31/206
•
Electrical safety analysis during annual maintenance not performed
•
Verification of explosion protection during annual maintenance not performed
•
Incorrect and incomplete grounding before recommissioning
Trouble-shooting and Repairs
•
Non-observance of warning messages in the Service Manual
•
Trouble-shooting of live parts without specified safety measures
•
Absence of a plausibility check to rule out erroneous inscription of electrical components
•
Performance of repair work by untrained/insufficiently qualified personnel
•
Inappropriate repairs which do not meet the quality standard specified by BINDER
•
Use of replacement parts other than BINDER original replacement parts
•
Electrical safety analysis not performed after repairs
•
Verification of explosion protection not performed after repairs
Summary of Contents for vdl 115
Page 192: ...VDL E3 1 06 2020 Page 192 206 28 6 Dimensions 28 6 1 VDL 23 Dimensions in mm ...
Page 193: ...VDL E3 1 06 2020 Page 193 206 28 6 2 VDL 56 Dimensions in mm ...
Page 194: ...VDL E3 1 06 2020 Page 194 206 28 6 3 VDL 115 Dimensions in mm ...
Page 198: ...VDL E3 1 06 2020 Page 198 206 ...
Page 199: ...VDL E3 1 06 2020 Page 199 206 ...
Page 200: ...VDL E3 1 06 2020 Page 200 206 31 Product registration ...
Page 207: ......