87
A:
With helper place Tunnel Assembly over floor boards. Make sure (2403) Tunnel Top is centred over the
pilot holes in (2398) Tunnel Left End and the bottoms of both boards are flush to each other. Ends of the
Tunnel Assembly should sit tight against both (2361) A Frame Uprights. Attach (2398) Tunnel Left End to
(2403) Tunnel Top with 2 (S3) #8 x 2-1/2” Wood Screws. (fig. 40.1 and 40.2)
B:
Make sure the bottom of the Tunnel sits 1-1/2” up from the bottom of both (2362) Back Tunnel Support and
(2373) Front Tunnel Support then install 1 (S10) #8 x 1” Pan Screw to each support in the holes closes to the A
Frame. (fig. 40.3)
C:
Maintaining the 1-1/2” measurement on each (2362) Back Tunnel Support and (2373) Front Tunnel Support
install 6 (S10) #8 x 1” Pan Screws in each support working from A Frame towards the main fort. (fig. 40.3)
Step 40: Attach Tunnel Assembly to Fort
Part 1
Hardware
Fig. 40.1
2403
x 6 per
side
Fig. 40.2
Fig. 40.3
2398
2 x
#8 x 2-1/2” Wood Screw
12 x
#8 x 1” Pan Screw
S3
S10
S3
Flush
S10
1-1/2”
Main Fort
2362
A Frame
2373
and
2361
Summary of Contents for HILLCREST F23270
Page 3: ...3 support solowavedesign com...
Page 4: ...4 support solowavedesign com...
Page 5: ...5 support solowavedesign com...
Page 110: ...110 support solowavedesign com NOTES...