84
F:
Place (2397) Tunnel Joist tight to underside of the floor boards, covering the pilot holes, between (2362)
Back Tunnel Support and (2373) Front Tunnel Support. Attach (2397) Tunnel Joist to both supports with 2 (S3)
#8 x 2-1/2” Wood Screws per support. (fig 38.10 and 38.11)
G:
Attach floor boards to (2397) Tunnel Joist and (2379) Mid Joist with 4 (S2) #8 x 1-1/2” Wood Screws per
board. (fig. 38.12 and 38.13)
Step 38: Connect A Frame to Fort
Part 3
Hardware
4 x
#8 x 2-1/2” Wood Screw
16x
#8 x 1-1/2” Wood Screw
S3
Wood Parts
1 x
Tunnel Joist 2 x 3 x 18-1/4”
2397
Fig. 38.10
View from
Underneath
2397
Floor Boards
Fig. 38.12
Fig. 38.11
Fig. 38.13
S2
x 16
(hidden)
2373
2379
(hidden)
S3
x 2 per side
2362
2397
2373
S2
Summary of Contents for HILLCREST F23270
Page 3: ...3 support solowavedesign com...
Page 4: ...4 support solowavedesign com...
Page 5: ...5 support solowavedesign com...
Page 110: ...110 support solowavedesign com NOTES...