H2AIR
®
ARCH
24
Belanger, Inc.® *PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL958
Installation
Tunnel Placement
10) Verify the passenger leg is square and plumb in all directions using a level; shims may be used
under the foot plate if necessary.
11) Drill the lag holes in the concrete and use the supplied 5/8
” lag bolts to secure the passenger foot
plate to the floor.
Note:
Remember to verify where any underground heat or utilities run so you can be sure to not
drill into them with the hammer drill when making the lag holes.
Note:
Do not hammer the lag bolts all the way down at this time, leave room to raise the foot plate
later if necessary.
Driver Side
Passenger Side
5/8” Lag Bolts