H2AIR
®
ARCH
26
Belanger, Inc.® *PO BOX 5470 *Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL958
Installation
Route LED Cables from Leg Assemblies to Electrical Box
1) Route the LED Cable from the driver side Leg Assembly to the Electrical Box mounted on the
driver side of the Top Flip Weldment, as shown in the images below.
2) Route the LED Cable from the passenger side Leg Assembly to the same Electrical Box, as
shown above.
3) These cables will be connected to the main power in the Utilities section of this manual.
LED Cable for
DS Leg Asy
LED Cable
for PS Leg
Asy
Step 2
Route the LED Cable
from the PS Leg Asy to
the Electrical Box on the
driver side of the Top Flip
Weldment.
Electrical Box
for Leg Asy.
LEDs
Step 1
Route the LED Cable
from the DS Leg Asy to
the Electrical Box on the
driver side of the Top Flip
Weldment.