9440300990 Rev J
19
DECS-250
Synchronizer
J
Gen to Bus PT Match Level
: Adjustable from 0 to 700% in 0.1% increments.
K
Angle Compensation (°)
: Adjustable from 0.0 to 359.9° in 0.1° increments.
L
Sync Fail Activation Delay
: Adjustable from 0.1 to 600 s in 0.1 s increments.
Voltage Matching
BESTCOMSPlus Navigation Path:
Settings Explorer, Synchronizer/Voltage Matching, Voltage Matching
HMI Navigation Path:
Settings, Sync/Voltage Matching, Voltage Matching
When enabled
A
, voltage matching is active in AVR control mode and automatically adjusts the AVR mode
setpoint to match the sensed bus voltage. Voltage matching is based on two parameters: band and
matching level.
The voltage matching band
B
defines the window in which the generator voltage must be for voltage
matching to occur.
A generator to bus PT matching level
C
setting is provided to compensate for step-up or step-down
transformers in the system. The DECS-250 adjusts the sensed generator voltage by this percentage. This
setting also appears on the Synchronizer screen, above. When the value is changed, it is reflected in both
places.
Voltage matching settings are illustrated in Figure 11.
Figure 11. Voltage Matching Settings
A
Voltage Matching
: Select Enabled to enable function.
B
Band
: Adjustable from 0 to 20% in 0.1% increments.
C
Gen to Bus PT Match Level
: Adjustable from 0 to 700% in 0.1% increments.
Breaker Hardware Configuration
BESTCOMSPlus Navigation Path:
Settings Explorer, Synchronizer/Voltage Matching, Breaker
Hardware
HMI Navigation Path:
Settings, Sync/Voltage Matching, Breaker Hardware
The DECS-250 can control and monitor a generator breaker. Breaker hardware settings are illustrated in
Figure 12.
Breaker Failure
When a close command is issued to the breaker, the DECS-250 monitors the breaker status and
annunciates a breaker failure if the breaker does not close within the time defined by the breaker close
wait delay
A
. Typically, the wait delay is set to be longer than the actual breaker closing time.
Generator Breaker
The DECS-250 must be configured
B
with the generator breaker characteristics before the breaker can be
controlled by the DECS-250. Breakers controlled by pulse or continuous control inputs
C
are supported.
During anticipatory-mode synchronization, if the generator breaker is serving to tie the generator to the
Summary of Contents for DECS-250
Page 2: ......
Page 6: ...iv 9440300990 Rev J Revision History DECS 250 ...
Page 16: ...xiv 9440300990 Rev J Contents DECS 250 ...
Page 20: ...4 9440300990 Rev J Introduction DECS 250 ...
Page 28: ...12 9440300990 Rev J Power Stage DECS 250 ...
Page 32: ...16 9440300990 Rev J Voltage and Current Sensing DECS 250 ...
Page 40: ...24 9440300990 Rev J Synchronizer DECS 250 ...
Page 52: ...36 9440300990 Rev J Auxiliary Control DECS 250 ...
Page 56: ...40 9440300990 Rev J Contact Inputs and Outputs DECS 250 ...
Page 84: ...68 9440300990 Rev J Limiters DECS 250 ...
Page 114: ...98 9440300990 Rev J Power System Stabilizer DECS 250 Figure 96 PSS Parameter Settings ...
Page 124: ...108 9440300990 Rev J Stability Tuning DECS 250 ...
Page 126: ...110 9440300990 Rev J Mounting DECS 250 Figure 103 Overall and Projection Mounting Dimensions ...
Page 127: ...9440300990 Rev J 111 DECS 250 Mounting Figure 104 DECS 250 Escutcheon Plate Dimensions ...
Page 198: ...182 9440300990 Rev J Timekeeping DECS 250 ...
Page 210: ...194 9440300990 Rev J CAN Communication DECS 250 ...
Page 304: ...288 9440300990 Rev J Maintenance DECS 250 ...
Page 316: ...300 9440300990 Rev J Specifications DECS 250 ...
Page 334: ...318 9440300990 Rev J Analog Expansion Module DECS 250 ...
Page 351: ......