INSTALLATION
SETUP/PHYSICAL INSTALLATION
2 - 12
I-E96-401A
®
6. Connect an 18 AWG wire from the chassis ground terminal
of the termination module to the cabinet chassis ground bolt.
7. Insert the module until it locks securely into place.
8. Replace (snap on) the front cover.
The termination module is ready for operation if:
1. The fuses are installed.
2. The cable is installed and verified.
3. All field wiring is complete.
4. Power is connected and applied to the termination module.
Summary of Contents for infi 90 NIMP01
Page 2: ......