D 3.1 7
D_3
.1_0
1_G
B.
fm
7
-16
Hydraulic folding roof (87) (
o
)
The hydraulically folding roof is secured
by means of a latch (A) at the rear sus-
pension on the left and right sides of the
machine. This must be released prior to
lowering and raising. Once it has
reached its terminal position, the roof
must be secured with the latch again.
The hydraulic unit and the key-operated
switch (A) for actuating the folding roof
hydraulic system are located on the left
side of the paver finisher's rear panel.
A
The roof can be raised and lowered with-
out having to start the drive motor.
- In order to lower the roof, turn the key-
operated switch (B) to the right until
the roof has been lowered to its mini-
mum level.
f
Danger of crushing! Ensure that nobody
inserts their fingers or hands into the
joint areas or are placed at risk by the
lowering roof during the folding proce-
dure.
- In order to raise the roof again, turn
the key-operated switch (B) to the left
until the roof has been raised to its
maximum height.
If it is necessary to raise the roof whilst the battery is discharged, a manual pump is
available on the hydraulic unit.
- Actuate the pump lever (C) until the roof can be secured with the latch bolt (A) in its
uppermost position.
Two throttles are installed to adjust the raising and lowering speed:
- Throttle valve (D): Adjust roof raising speed.
Turning the adjusting knob in the clockwise direction = lower speed.
Turning anti-clockwise = higher speed.
- Throttle valve (E): Adjust roof lowering speed.
Turning the adjusting knob in the clockwise direction = lower speed.
Turning anti-clockwise = higher speed.
Dachkons.bmp/Dach_Hydr.wmf
C
B
D
E
A
Summary of Contents for DYNAPAC Svedala Demag DF 115 C
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 58: ......
Page 62: ...D 1 4 4 D_1 4_01_GB fm 4 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 64: ...D 1 4 6 D_1 4_01_GB fm 6 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 96: ......
Page 120: ...D 4 6 24 D_4 6_01_GB fm 24 38 2 2 Error messages...
Page 121: ...D 4 6 25 D_4 6_01_GB fm 25 38...
Page 122: ...D 4 6 26 D_4 6_01_GB fm 26 38...
Page 123: ...D 4 6 27 D_4 6_01_GB fm 27 38...
Page 124: ...D 4 6 28 D_4 6_01_GB fm 28 38...
Page 125: ...D 4 6 29 D_4 6_01_GB fm 29 38 2 3 FMI codes...
Page 134: ......
Page 146: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 152: ......
Page 154: ......
Page 157: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 161: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 168: ......
Page 180: ......
Page 181: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 220: ......
Page 221: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 226: ......