4
35
_DF115C_DF
135C_O
M
M
_
CO
N_02_G
BI
VZ.
fm
4-
8
D4.6
Operation ................................................................................. 1
1
Preparation of operation ............................................................................ 1
Required devices and aids .................................................................... 1
Before starting work (in the morning or when starting paving) .............. 2
Checklist for the machine operator ........................................................ 2
1.1
Starting the paver finisher .......................................................................... 4
Before starting the paver finisher ........................................................... 4
„Normal” starting .................................................................................... 4
External starting (starting aid) ................................................................ 5
After starting .......................................................................................... 6
Indicator lamps ...................................................................................... 6
Battery charge indicator (1). .................................................................. 6
Oil pressure indicator lamp for the traction drive (2) .............................. 6
1.2
Preparations for paving .............................................................................. 8
Separating agent ................................................................................... 8
Screed heater ........................................................................................ 8
Direction marks ...................................................................................... 8
Loading/distributing material .................................................................. 9
1.3
Starting for paving .................................................................................... 11
1.4
Checks during paving .............................................................................. 13
Paver function ...................................................................................... 13
Quality of the layer ............................................................................... 13
1.5
Paving with functions „screed control, stopping of paver finisher“
and „screed loading / unloading“ .............................................................. 14
General ................................................................................................ 14
Screed charging/relieving .................................................................... 15
Screed control with the paver finisher standing still
(Floating position with and without prestressing) ................................. 15
Screed control with the paver finisher at standstill -
with floating position prestressing ........................................................ 16
Adjusting the pressure ......................................................................... 16
Adjustment of pressure for the loading/offloading of the screed .......... 17
Screed control pressure with the paver finisher at standstill -
set the floating position with prestressing (o) ....................................... 17
1.6
Interrupting/terminating operation ............................................................ 18
During breaks (e.g. the material supply truck is late) ........................... 18
During extended interruptions (e.g. lunch break) ................................. 18
When work is finished .......................................................................... 19
2
Malfunctions ............................................................................................. 21
2.1
Querying the error messages of the traction engine ................................ 21
Display of the number code ................................................................. 21
2.2
Error messages ........................................................................................ 24
2.3
FMI-codes ................................................................................................ 29
2.4
Problems during paving ........................................................................... 30
2.5
Malfunctions on the paver finisher or screed ........................................... 32
3
Emergency device/steering, drive system ............................................... 35
Summary of Contents for DYNAPAC Svedala Demag DF 115 C
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 58: ......
Page 62: ...D 1 4 4 D_1 4_01_GB fm 4 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 64: ...D 1 4 6 D_1 4_01_GB fm 6 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 96: ......
Page 120: ...D 4 6 24 D_4 6_01_GB fm 24 38 2 2 Error messages...
Page 121: ...D 4 6 25 D_4 6_01_GB fm 25 38...
Page 122: ...D 4 6 26 D_4 6_01_GB fm 26 38...
Page 123: ...D 4 6 27 D_4 6_01_GB fm 27 38...
Page 124: ...D 4 6 28 D_4 6_01_GB fm 28 38...
Page 125: ...D 4 6 29 D_4 6_01_GB fm 29 38 2 3 FMI codes...
Page 134: ......
Page 146: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 152: ......
Page 154: ......
Page 157: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 161: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 168: ......
Page 180: ......
Page 181: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 220: ......
Page 221: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 226: ......