Setting Up a Base Station
B-3
Set
tin
g Up
a
Bas
e St
ati
o
n
11. Enter a recording interval, typically 1, 2 or 5 seconds.
It is critical for the Reliance Processor that the recording interval for the base
station be identical to the rover recording interval.
12. Press F4 (OK) to accept the changes and return to the GIS Main menu.
13. Press F4 (RETN) to return to the FAMlog screen.
14. Press F4 (SETP) to open the Session Setup screen (Figure B.4)
15. Enter
BASE
in the SESSION NAME field. You do not need to select a
feature or waypoint file, since you are not logging features.
16. Press F4 (OK) to accept the changes and return to the FAMlog screen.
The receiver is now recording data as a base station.
17. Turn off the FS/2.
The FS/2 is not required for the receiver to log data as a base station, and can
be used with a different rover system.
18. Upon completing the survey, press the power button on the receiver for more
than one second (or disconnect the batteries) to stop recording.
Figure B.4: Session Setup Screen
Summary of Contents for Reliance FS/2
Page 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Page 6: ...vi Reliance with FS 2 Field Operations Manual...
Page 14: ...xiv Reliance with FS 2 Field Operations Manual...
Page 26: ...10 Reliance with FS 2 Field Operations Manual...
Page 150: ...134 Reliance with FS 2 Field Operations Manual...
Page 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Page 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Page 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Page 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Page 182: ...F 6 Reliance with FS 2 Field Operations Manual...