![ashtech Reliance FS/2 Operation Manual Download Page 77](http://html1.mh-extra.com/html/ashtech/reliance-fs-2/reliance-fs-2_operation-manual_2982703077.webp)
Field Operation
61
F
ie
ld
O
p
erat
ion
1.
Call the GIS main menu, Figure 3.43.
2.
Press Shift F1 (DSST), calling the Display Setup screen, Figure 3.44.
3.
Verify that FORMAT is set to GRID; if FORMAT is GEOGRAPHIC, use
the Sp (space) key to toggle the setting from GEOGRAPHIC to GRID.
Figure 3.43: GIS Screen
Figure 3.44: Display Setup Screen.
Summary of Contents for Reliance FS/2
Page 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Page 6: ...vi Reliance with FS 2 Field Operations Manual...
Page 14: ...xiv Reliance with FS 2 Field Operations Manual...
Page 26: ...10 Reliance with FS 2 Field Operations Manual...
Page 150: ...134 Reliance with FS 2 Field Operations Manual...
Page 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Page 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Page 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Page 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Page 182: ...F 6 Reliance with FS 2 Field Operations Manual...