![ashtech Reliance FS/2 Operation Manual Download Page 163](http://html1.mh-extra.com/html/ashtech/reliance-fs-2/reliance-fs-2_operation-manual_2982703163.webp)
Basic FS/2 Operation
C-5
Basi
c F
S
/2
O
p
erat
io
n
5.
Always clean or dry the screen with a soft cloth.
Downloading Data
After you have completed the session, you must download the receiver data to a PC
for viewing, filtering, post-processing, and exporting. These procedures are described
in the Reliance Processor Office User’s Guide.
Uploading New Feature and Waypoint Files
Uploading files from the PC to the FS/2 requires a data connection between the PC
and the FS/2:
1.
Exit FAMlog on the FS/2.
2.
Disconnect the FS/2 from the GPS receiver.
3.
Connect the FS/2 to the PC COM port.
4.
At the FS/2 DOS prompt C>, type
HCOM
.
The FS/2 is now ready to receive file transfers.
You may upload feature and waypoint files directly from the Reliance PC program. Refer to the
Reliance Processor Office User’s Guide for a detailed explanation of this operation.
FS/2 Battery Management
Replacing Batteries
To replace batteries in the FS/2:
1.
Turn the FS/2 off.
2.
Remove the battery cap using a coin.
CAUTION
Do not use organic or harsh detergents, as they may damage the case.
CAUTION
Do not allow moisture into the battery compartment.
Summary of Contents for Reliance FS/2
Page 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Page 6: ...vi Reliance with FS 2 Field Operations Manual...
Page 14: ...xiv Reliance with FS 2 Field Operations Manual...
Page 26: ...10 Reliance with FS 2 Field Operations Manual...
Page 150: ...134 Reliance with FS 2 Field Operations Manual...
Page 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Page 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Page 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Page 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Page 182: ...F 6 Reliance with FS 2 Field Operations Manual...