Field Operation
57
F
ie
ld
O
p
erat
ion
10. Press F4 (RETN) to return to the GIS main menu. In the GIS main menu,
press Shift F2 (RCVR), calling the Receiver Setup screen, Figure 3.36.
11. In the Receiver Setup screen, press F2 (MODE), calling the Differential
Mode screen, Figure 3.37.
Figure 3.36: Receiver Setup Screen
Figure 3.37: Differenital Mode Screen
Summary of Contents for Reliance FS/2
Page 2: ...ii Reliance with FS 2 Field Operations Manual FS 2 Screen Map...
Page 6: ...vi Reliance with FS 2 Field Operations Manual...
Page 14: ...xiv Reliance with FS 2 Field Operations Manual...
Page 26: ...10 Reliance with FS 2 Field Operations Manual...
Page 150: ...134 Reliance with FS 2 Field Operations Manual...
Page 158: ...B 4 Reliance with FS 2 Field Operations Manual...
Page 160: ...C 2 Reliance with FS 2 Field Operations Manual Figure C 1 FS 2 Handheld Controller...
Page 170: ...C 12 Reliance with FS 2 Field Operations Manual...
Page 176: ...E 4 Reliance with FS 2 Field Operations Manual...
Page 182: ...F 6 Reliance with FS 2 Field Operations Manual...