ascom
Ascotel 2025/2045/2065
HBT_20321104_04/B0_en
Connecting the PBX
4.27
6
Connecting the PBX
4
There are two connection possibilities:
• Direct connection to the network and subscriber-side cabling
• Indirect connection (e.g. via a main distribution board) to the network and sub-
scriber-side cabling
Fig. 4.19:
Direct connection (left) and indirect connection (right)
6.1
Direct Connection
Direct connection is via two-conductor pillar terminal blocks. The two-conductor
pillar terminal blocks are supplied with the PBX; they can also be ordered in packs
from the system supplier.
Suitable connecting wire:
• Solid copper conductor
• Conductor diameter 0.4 to 0.8 mm
Main distri-
bution board
PBX
NT1
NT1
haz1111aaena0
PBX
NT1
NT1
haz1110aadea0
Summary of Contents for Ascotel 2025
Page 1: ...Ascotel ISDN telecommunications system from ascom Ascotel 2025 2045 2065 System Manual...
Page 51: ...ascom Ascotel 2025 2045 2065 1 II HBT_20321104_01 B0_en...
Page 109: ...ascom Ascotel 2025 2045 2065 1 54 Networking the Systems HBT_20321104_01 B0_en...
Page 169: ...ascom Ascotel 2025 2045 2065 2 II HBT_20321104_02 B0_en...
Page 177: ...ascom Ascotel 2025 2045 2065 2 X HBT_20321104_02 B0_en...
Page 291: ...ascom Ascotel 2025 2045 2065 2 114 Routing Elements HBT_20321104_02 B0_en...
Page 397: ...ascom Ascotel 2025 2045 2065 2 220 Data Services HBT_20321104_02 B0_en...
Page 627: ...ascom Ascotel 2025 2045 2065 3 II HBT_20321104_03 B0_en...
Page 653: ...ascom Ascotel 2025 2045 2065 3 22 System and Expansion Limits HBT_20321104_03 B0_en...
Page 717: ...ascom Ascotel 2025 2045 2065 3 86 Planning DECT Systems HBT_20321104_03 B0_en...
Page 765: ...ascom Ascotel 2025 2045 2065 3 134 Planning a Private Network HBT_20321104_03 B0_en...
Page 767: ...ascom Ascotel 2025 2045 2065 4 II HBT_20321104_04 B0_en...
Page 771: ...ascom Ascotel 2025 2045 2065 4 VI HBT_20321104_04 B0_en...
Page 805: ...ascom Ascotel 2025 2045 2065 4 34 Connecting the PBX HBT_20321104_04 B0_en...
Page 875: ...ascom Ascotel 2025 2045 2065 4 104 Cabling Interfaces HBT_20321104_04 B0_en...
Page 897: ...ascom Ascotel 2025 2045 2065 5 II HBT_20321104_05 B0_en...
Page 929: ...ascom Ascotel 2025 2045 2065 5 30 Configuration Steps HBT_20321104_05 B0_en...
Page 971: ...ascom Ascotel 2025 2045 2065 6 II HBT_20321104_06 B0_en...
Page 995: ...ascom Ascotel 2025 2045 2065 7 II HBT_20321104_07 B0_en...
Page 999: ...ascom Ascotel 2025 2045 2065 7 VI HBT_20321104_07 B0_en...
Page 1019: ...ascom Ascotel 2025 2045 2065 7 20 Data Maintenance HBT_20321104_07 B0_en...
Page 1085: ...ascom Ascotel 2025 2045 2065 7 86 Operations Supervision HBT_20321104_07 B0_en...
Page 1087: ...ascom Ascotel 2025 2045 2065 8 II HBT_20321104_08 B0_en...
Page 1089: ...ascom Ascotel 2025 2045 2065 8 IV HBT_20321104_08 B0_en...
Page 1095: ...ascom Ascotel 2025 2045 2065 8 6 Systematic Designation System HBT_20321104_08 B0_en...
Page 1115: ...ascom Ascotel 2025 2045 2065 8 26 Designation Labels HBT_20321104_08 B0_en...
Page 1117: ...ascom Ascotel 2025 2045 2065 9 II HBT_20321104_09 B0_en...
Page 1123: ...ascom Ascotel 2025 2045 2065 9 6 Abbreviations HBT_20321104_09 B0_en...
Page 1135: ...ascom Ascotel 2025 2045 2065 9 18 Glossary HBT_20321104_09 B0_en...