ascom
Ascotel 2025/2045/2065
6.20
Handover to the Customer
HBT_20321104_06/B0_en
5
Handover to the Customer
6
The following checklists contains the main points to be taken into account when
the system is handed over to the customer.
Documentation
• Are all the terminals clearly and intelligibly labelled?
• Does each terminal have its own operating instructions?
• Are additional operating instructions required (e.g. operating instructions for
Office system terminals, operating instructions for the System Assistant, etc.)?
• In which form should the system configuration be archived:
– in paper form next to the PBX?
– or as software stored on the PC or on diskette?
• Are the passwords stored in a suitable place?
• Is the distribution list filled out (stored with the distribution frame)?
Customer-specific Agreements
• Are all customer-specific applications fully documented?
Phone Book Setup/ Takeover
• Is the internal phone book set up on the system in accordance with the cus-
tomer’s wishes?
Other Checkpoints
• Has the customer received the brochures and price lists on:
– Expansion / extension possibilities (to increase performance)
– Additional terminals (add-on products; to improve user convenience)
Summary of Contents for Ascotel 2025
Page 1: ...Ascotel ISDN telecommunications system from ascom Ascotel 2025 2045 2065 System Manual...
Page 51: ...ascom Ascotel 2025 2045 2065 1 II HBT_20321104_01 B0_en...
Page 109: ...ascom Ascotel 2025 2045 2065 1 54 Networking the Systems HBT_20321104_01 B0_en...
Page 169: ...ascom Ascotel 2025 2045 2065 2 II HBT_20321104_02 B0_en...
Page 177: ...ascom Ascotel 2025 2045 2065 2 X HBT_20321104_02 B0_en...
Page 291: ...ascom Ascotel 2025 2045 2065 2 114 Routing Elements HBT_20321104_02 B0_en...
Page 397: ...ascom Ascotel 2025 2045 2065 2 220 Data Services HBT_20321104_02 B0_en...
Page 627: ...ascom Ascotel 2025 2045 2065 3 II HBT_20321104_03 B0_en...
Page 653: ...ascom Ascotel 2025 2045 2065 3 22 System and Expansion Limits HBT_20321104_03 B0_en...
Page 717: ...ascom Ascotel 2025 2045 2065 3 86 Planning DECT Systems HBT_20321104_03 B0_en...
Page 765: ...ascom Ascotel 2025 2045 2065 3 134 Planning a Private Network HBT_20321104_03 B0_en...
Page 767: ...ascom Ascotel 2025 2045 2065 4 II HBT_20321104_04 B0_en...
Page 771: ...ascom Ascotel 2025 2045 2065 4 VI HBT_20321104_04 B0_en...
Page 805: ...ascom Ascotel 2025 2045 2065 4 34 Connecting the PBX HBT_20321104_04 B0_en...
Page 875: ...ascom Ascotel 2025 2045 2065 4 104 Cabling Interfaces HBT_20321104_04 B0_en...
Page 897: ...ascom Ascotel 2025 2045 2065 5 II HBT_20321104_05 B0_en...
Page 929: ...ascom Ascotel 2025 2045 2065 5 30 Configuration Steps HBT_20321104_05 B0_en...
Page 971: ...ascom Ascotel 2025 2045 2065 6 II HBT_20321104_06 B0_en...
Page 995: ...ascom Ascotel 2025 2045 2065 7 II HBT_20321104_07 B0_en...
Page 999: ...ascom Ascotel 2025 2045 2065 7 VI HBT_20321104_07 B0_en...
Page 1019: ...ascom Ascotel 2025 2045 2065 7 20 Data Maintenance HBT_20321104_07 B0_en...
Page 1085: ...ascom Ascotel 2025 2045 2065 7 86 Operations Supervision HBT_20321104_07 B0_en...
Page 1087: ...ascom Ascotel 2025 2045 2065 8 II HBT_20321104_08 B0_en...
Page 1089: ...ascom Ascotel 2025 2045 2065 8 IV HBT_20321104_08 B0_en...
Page 1095: ...ascom Ascotel 2025 2045 2065 8 6 Systematic Designation System HBT_20321104_08 B0_en...
Page 1115: ...ascom Ascotel 2025 2045 2065 8 26 Designation Labels HBT_20321104_08 B0_en...
Page 1117: ...ascom Ascotel 2025 2045 2065 9 II HBT_20321104_09 B0_en...
Page 1123: ...ascom Ascotel 2025 2045 2065 9 6 Abbreviations HBT_20321104_09 B0_en...
Page 1135: ...ascom Ascotel 2025 2045 2065 9 18 Glossary HBT_20321104_09 B0_en...