ascom
Ascotel 2025/2045/2065
HBT_20321104_03/B0_en
Overview of Chapters
3.1
1
Overview of Chapters
3
Basic systems can be expanded using expansion cards and licences. Chapter 2
describes which expansion options are available for which basic system and con-
tains examples of component placement.
Chapter 3 provides an overview of the technical and licence-related limits to the
expansion of basic systems. Here we need to differentiate between fixed technical
system limits, e.g. the number of interfaces and slots, and power supply or mem-
ory-related limits, which depend on the number of terminals and their power
requirements. This chapter contains the basics for manual calculation.
The first phase of any successful planning project is to determine the customer's
actual communication situation, his requirements and what he has in mind for the
expansion of the system. You can enter this customer-related information directly
into the AIMS Project Manager. A rough guideline quotation is then drawn up on
the basis of the information and adapted with the customer.
After this coordination process a definitive quotation is drawn up in phase 2; this
is where you begin with the detailed planning of the communication system.
Functions relevant to the system's operation are discussed with the customer and
implemented in the Project Manager.
The AIMS Project Manager assists you in all the phases of system planning and
automatically takes account of the system and expansion limits. With its help you
can draw up a complete documentation package (list printouts) for the planned
systems.
Summary of Contents for Ascotel 2025
Page 1: ...Ascotel ISDN telecommunications system from ascom Ascotel 2025 2045 2065 System Manual...
Page 51: ...ascom Ascotel 2025 2045 2065 1 II HBT_20321104_01 B0_en...
Page 109: ...ascom Ascotel 2025 2045 2065 1 54 Networking the Systems HBT_20321104_01 B0_en...
Page 169: ...ascom Ascotel 2025 2045 2065 2 II HBT_20321104_02 B0_en...
Page 177: ...ascom Ascotel 2025 2045 2065 2 X HBT_20321104_02 B0_en...
Page 291: ...ascom Ascotel 2025 2045 2065 2 114 Routing Elements HBT_20321104_02 B0_en...
Page 397: ...ascom Ascotel 2025 2045 2065 2 220 Data Services HBT_20321104_02 B0_en...
Page 627: ...ascom Ascotel 2025 2045 2065 3 II HBT_20321104_03 B0_en...
Page 653: ...ascom Ascotel 2025 2045 2065 3 22 System and Expansion Limits HBT_20321104_03 B0_en...
Page 717: ...ascom Ascotel 2025 2045 2065 3 86 Planning DECT Systems HBT_20321104_03 B0_en...
Page 765: ...ascom Ascotel 2025 2045 2065 3 134 Planning a Private Network HBT_20321104_03 B0_en...
Page 767: ...ascom Ascotel 2025 2045 2065 4 II HBT_20321104_04 B0_en...
Page 771: ...ascom Ascotel 2025 2045 2065 4 VI HBT_20321104_04 B0_en...
Page 805: ...ascom Ascotel 2025 2045 2065 4 34 Connecting the PBX HBT_20321104_04 B0_en...
Page 875: ...ascom Ascotel 2025 2045 2065 4 104 Cabling Interfaces HBT_20321104_04 B0_en...
Page 897: ...ascom Ascotel 2025 2045 2065 5 II HBT_20321104_05 B0_en...
Page 929: ...ascom Ascotel 2025 2045 2065 5 30 Configuration Steps HBT_20321104_05 B0_en...
Page 971: ...ascom Ascotel 2025 2045 2065 6 II HBT_20321104_06 B0_en...
Page 995: ...ascom Ascotel 2025 2045 2065 7 II HBT_20321104_07 B0_en...
Page 999: ...ascom Ascotel 2025 2045 2065 7 VI HBT_20321104_07 B0_en...
Page 1019: ...ascom Ascotel 2025 2045 2065 7 20 Data Maintenance HBT_20321104_07 B0_en...
Page 1085: ...ascom Ascotel 2025 2045 2065 7 86 Operations Supervision HBT_20321104_07 B0_en...
Page 1087: ...ascom Ascotel 2025 2045 2065 8 II HBT_20321104_08 B0_en...
Page 1089: ...ascom Ascotel 2025 2045 2065 8 IV HBT_20321104_08 B0_en...
Page 1095: ...ascom Ascotel 2025 2045 2065 8 6 Systematic Designation System HBT_20321104_08 B0_en...
Page 1115: ...ascom Ascotel 2025 2045 2065 8 26 Designation Labels HBT_20321104_08 B0_en...
Page 1117: ...ascom Ascotel 2025 2045 2065 9 II HBT_20321104_09 B0_en...
Page 1123: ...ascom Ascotel 2025 2045 2065 9 6 Abbreviations HBT_20321104_09 B0_en...
Page 1135: ...ascom Ascotel 2025 2045 2065 9 18 Glossary HBT_20321104_09 B0_en...