ascom
Ascotel 2025/2045/2065
HBT_20321104_03/B0_en
Planning a Private Network
3.111
In each system create one route for each of the other systems.
1. Create a route for each system:
– For system 1: route 5
– For system 2: route 6
– For system 3: route 7
2. In each system, name the routes you have just defined:
– Route 5: for PINX 1
– Route 6: for PINX 2
– Route 7: for PINX 3
3. In system 1 create one route for system 3 (route 1-7) and one route for
system 2 (route 1-6).
4. In system 2 create one route for system 1 (route 2-5) and one route for
system 3 (route 2-7).
5. In system 3 create one route for system 1 (route 3-5) and one route for
system 2 (route 3-6).
6.2.1.2
Defining the Routes to the Public Network
In each system create a route to the public network. The simplest way is to reserve
one route number for the public network.
System 1 is the gateway PINX, i.e. all the calls between the private leased-line net-
work and the public network are routed via this system. The route that assumes
this task must be specified.
1. Reserve route 1 for the public network.
2. In each system create the route to the public network:
– System 1: Route 1 (route 1-1)
– System 2: Route 1 (route 2-1)
– System 3: Route 1 (route 3-1)
3. In all the systems, specify route 1 as "to the public network".
4. In system 1 specify route 1 for routing calls from other systems to the public
network:
– Transit route = route 1
Summary of Contents for Ascotel 2025
Page 1: ...Ascotel ISDN telecommunications system from ascom Ascotel 2025 2045 2065 System Manual...
Page 51: ...ascom Ascotel 2025 2045 2065 1 II HBT_20321104_01 B0_en...
Page 109: ...ascom Ascotel 2025 2045 2065 1 54 Networking the Systems HBT_20321104_01 B0_en...
Page 169: ...ascom Ascotel 2025 2045 2065 2 II HBT_20321104_02 B0_en...
Page 177: ...ascom Ascotel 2025 2045 2065 2 X HBT_20321104_02 B0_en...
Page 291: ...ascom Ascotel 2025 2045 2065 2 114 Routing Elements HBT_20321104_02 B0_en...
Page 397: ...ascom Ascotel 2025 2045 2065 2 220 Data Services HBT_20321104_02 B0_en...
Page 627: ...ascom Ascotel 2025 2045 2065 3 II HBT_20321104_03 B0_en...
Page 653: ...ascom Ascotel 2025 2045 2065 3 22 System and Expansion Limits HBT_20321104_03 B0_en...
Page 717: ...ascom Ascotel 2025 2045 2065 3 86 Planning DECT Systems HBT_20321104_03 B0_en...
Page 765: ...ascom Ascotel 2025 2045 2065 3 134 Planning a Private Network HBT_20321104_03 B0_en...
Page 767: ...ascom Ascotel 2025 2045 2065 4 II HBT_20321104_04 B0_en...
Page 771: ...ascom Ascotel 2025 2045 2065 4 VI HBT_20321104_04 B0_en...
Page 805: ...ascom Ascotel 2025 2045 2065 4 34 Connecting the PBX HBT_20321104_04 B0_en...
Page 875: ...ascom Ascotel 2025 2045 2065 4 104 Cabling Interfaces HBT_20321104_04 B0_en...
Page 897: ...ascom Ascotel 2025 2045 2065 5 II HBT_20321104_05 B0_en...
Page 929: ...ascom Ascotel 2025 2045 2065 5 30 Configuration Steps HBT_20321104_05 B0_en...
Page 971: ...ascom Ascotel 2025 2045 2065 6 II HBT_20321104_06 B0_en...
Page 995: ...ascom Ascotel 2025 2045 2065 7 II HBT_20321104_07 B0_en...
Page 999: ...ascom Ascotel 2025 2045 2065 7 VI HBT_20321104_07 B0_en...
Page 1019: ...ascom Ascotel 2025 2045 2065 7 20 Data Maintenance HBT_20321104_07 B0_en...
Page 1085: ...ascom Ascotel 2025 2045 2065 7 86 Operations Supervision HBT_20321104_07 B0_en...
Page 1087: ...ascom Ascotel 2025 2045 2065 8 II HBT_20321104_08 B0_en...
Page 1089: ...ascom Ascotel 2025 2045 2065 8 IV HBT_20321104_08 B0_en...
Page 1095: ...ascom Ascotel 2025 2045 2065 8 6 Systematic Designation System HBT_20321104_08 B0_en...
Page 1115: ...ascom Ascotel 2025 2045 2065 8 26 Designation Labels HBT_20321104_08 B0_en...
Page 1117: ...ascom Ascotel 2025 2045 2065 9 II HBT_20321104_09 B0_en...
Page 1123: ...ascom Ascotel 2025 2045 2065 9 6 Abbreviations HBT_20321104_09 B0_en...
Page 1135: ...ascom Ascotel 2025 2045 2065 9 18 Glossary HBT_20321104_09 B0_en...