
MT9090A/MU909011A Network Master User’s Guide
3-1
Chapter 3: General Operation and
System Setups
General Operation
This section assumes that the battery pack is already charged
or that the AC charger/adapter is connected to the unit.
Refer to the following sections for details on charging the
battery pack or connecting the AC charger/adapter:
•
“Charging the Ni-MH Battery Pack” on page 2-14
•
“AC Power Operation” on page 2-13
Power Up/Power Down
To Power Up the unit:
•
Press the
Menu/Power key
. The unit preforms
a self-test during which the Anritsu splash screen
briefly appears, followed by the Network Master
splash screen. Once the self-test is complete, one of
the following initial test application screens appears
depends on the Power Meter Step and Connection
Check Step settings made on the Preferences Setup
screen (see Figure 4-4 on page 4-5).
Note
The Power Meter Step selection is only active on
units with the factory installed Power Meter option.
Summary of Contents for Network Master MT9090A Series
Page 32: ...xxxii MT9090A MU909011A Network Master User s Guide...
Page 40: ...1 8 MT9090A MU909011A Network Master User s Guide...
Page 68: ...2 28 MT9090A MU909011A Network Master User s Guide...
Page 98: ...3 30 MT9090A MU909011A Network Master User s Guide...
Page 142: ...4 44 MT9090A MU909011A Network Master User s Guide...
Page 162: ...6 6 MT9090A MU909011A Network Master User s Guide...
Page 180: ...7 18 MT9090A MU909011A Network Master User s Guide...
Page 185: ...MT9090A MU909011A Network Master User s Guide 8 5...
Page 186: ...8 6 MT9090A MU909011A Network Master User s Guide...