Installation and Start-Up
| 3-15
To install the Sample and Vent Lines:
1. Lay out the Sample and Vent Lines.
Route the Sample Line from the analyzer to the sample probe (or
process tap) and the Vent Line from the analyzer to the return/vent
location.
Ensure there are no loops, sags, or other traps in the Sample and Vent
Lines. Provide support where needed.
2. Make the connections at the analyzer. Refer to Figure 3-2.
3. Connect the Sample Line to the sample probe or process tap.
4. Connect the Vent Line from the analyzer to the return/vent location.
Pressure at the analyzer inlet connector must not exceed the ratings
marked on the inlet and on the Final “As-Built” drawings in the ana-
lyzer Documentation Package.
Installing and Connecting the Instrument Air/Zero Fluid Line
Instrument Air or Nitrogen can be used as the aspirator/pneumatic valve
drive fluid and to zero the analyzer. This procedure assumes Instrument
Air is being used for these functions. The procedure is the same, regard-
less of which medium is being used.
The customer supplies the Instrument Air/Zero fluid line. The tubing
must be 1/4" O.D. 316 stainless steel tubing with appropriate 1/4" tube
connectors.
If using Instrument Air:
• The Instrument Air must meet the ANSI/ISA-7.0.01 (1996) specifica-
tions at all times. If the Instrument Air cannot meet these require-
ments, an inlet filter system must be installed.
• The air must be supplied to the analyzer pressure regulator at a pres-
sure of 490–700 kPag (70–100 psig / 4.8–6.9 barg). Pressure require-
ments may vary, depending on the application; refer to Final “As-
Built” drawings in the analyzer Documentation Package.
If using N
2
:
• Use only ultrahigh purity (UHP) Nitrogen.
!
CAUTION
Summary of Contents for Western Research IPS-4
Page 48: ...2 18 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Page 140: ...4 48 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Page 172: ...5 32 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Page 178: ...6 6 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...
Page 218: ...A 2 IPS 4 Dual Bench UV IR Analyzer Analyzer Light Path UV Optical Bench Schematic...
Page 219: ...Appendix A Drawings A 3 Analyzer Light Path NDIR Optical Bench Schematic CONDENSING...
Page 222: ...A 6 IPS 4 Dual Bench UV IR Analyzer Detector Board 100 2046...
Page 223: ...Appendix A Drawings A 7 Display Interface Board 100 2049...
Page 225: ...Appendix A Drawings A 9 AC Disconnection Board 100 2077...
Page 227: ...Appendix A Drawings A 11 Relay Board 100 2050...
Page 228: ...A 12 IPS 4 Dual Bench UV IR Analyzer Analog Board 100 2047...
Page 229: ...Appendix A Drawings A 13 MCU Board 100 2045...
Page 230: ...A 14 IPS 4 Dual Bench UV IR Analyzer Xenon Lamp Power Supply Board 100 2061 UV Optical Bench...
Page 231: ...Appendix A Drawings A 15 Infrared Source Assembly Interface Board 100 2838 IR Optical Bench...
Page 232: ...A 16 IPS 4 Dual Bench UV IR Analyzer Electronics Enclosure Wiring Diagram Sheet 1 of 5...
Page 233: ...Appendix A Drawings A 17 Electronics Enclosure Wiring Diagram Sheet 2 of 5...
Page 234: ...A 18 IPS 4 Dual Bench UV IR Analyzer Electronics Enclosure Wiring Diagram Sheet 3 of 5...
Page 235: ...Appendix A Drawings A 19 Disconnect Enclosure Wiring Diagram Sheet 4 of 5...
Page 236: ...A 20 IPS 4 Dual Bench UV IR Analyzer Disconnect Enclosure Wiring Diagram Sheet 5 of 5...
Page 238: ...S 2 IPS 4 Dual Bench UV IR Analyzer This page intentionally left blank...