![Amazone Precea 3000-A Original Operating Manual Download Page 63](http://html1.mh-extra.com/html/amazone/precea-3000-a/precea-3000-a_original-operating-manual_2919773063.webp)
NOTE
The maximum filling capacity is reached when a
material cone is formed over the feed auger. If
possible, let the fertiliser run directly into the filling
funnel.
5.
Switch on the "beige" tractor control unit at 32 l/
min.
6.
Slowly switch on the filling auger's drive on the
ball valve
1
.
The fill level in the fertiliser hopper rises.
NOTE
Determine the payload of the implement and
axles loads of the tractor.
7.
Monitor the fill level through the inspection
window.
8.
When the fill level rises beyond the edge of the
inspection window,
reduce the filling auger speed with the ball valve
2
.
9.
When the fertiliser hopper is full,
slowly switch off the filling auger with the ball
valve.
10. Switch off the "beige" tractor control unit.
11. Swivel in the filling chute.
12. Close the cover tarpaulin of the filling funnel.
1
2
CMS-I-00001895
6 | Preparing the machine
Preparing the implement for operation
MG6659-EN-GB | F.1 | 25.10.2022 | © AMAZONE
57