5.
Secure the tractor and implement.
6.
Remove the bolt
2
.
7.
Remove the fastener
.
8.
To relieve the residual pressure from the
hydraulic coulter pressure system,
open the valve
3
.
9.
To relieve the residual pressure from the
opposite hydraulic coulter pressure system,
repeat steps 6 to 8 on the opposite section.
10. Take the tensioning strap
2
out of the sealing
kit.
11.
To fix the coulter pressure cylinder,
lash the top link
1
and the lower link
3
with a
tension belt.
2
1
3
CMS-I-00005312
ENVIRONMENTAL INFORMATION
Danger due to escaping oil
Collect any escaping oil.
Dispose of oil removal material in an
environmentally friendly manner.
12. Disconnect the connection
4
.
13. Install connectors
5
between the hydraulic
hoses.
14. Install sealing caps
1
from the sealing kit on the
T-piece
2
.
15.
To convert the hydraulic supply of the second
line
3
,
repeat steps 1 to 3.
5
1
4
2
3
CMS-I-00007201
6 | Preparing the machine
Preparing the implement for operation
MG6659-EN-GB | F.1 | 25.10.2022 | © AMAZONE
115