![Amada CD-A Series Operation Manual Download Page 30](http://html.mh-extra.com/html/amada/cd-a-series/cd-a-series_operation-manual_2915801030.webp)
CHAPTER 2: INSTALLATION AND SETUP
CD-A DUAL PULSE RESISTANCE WELDING POWER SUPPLY
2-8
990-430
24 VAC EZ-AIR™
NOTE:
These instructions are for both 24VDC and 24VAC EZ-AIR™ weld heads
1.
Connect Weld Head Cables as noted on Page 2-4.
2.
Adjust the weld head force adjustment knob to produce
5
units of force, as displayed on the force
indicator index.
3.
Connect the weld head firing switch cable connector to the Power Supply firing switch cable
connector.
4.
Connect a normally closed, agency compliant,
EMERGENCY STOP SWITCH
across the two leads
of the emergency stop switch connector cable. This switch, when operated (open), will
immediately stop the weld cycle and retract the weld head. See
Appendix B. Electrical and Data
Connections
for circuit details.
PNEUMATIC
AIR SUPPLY
FORCE
ADJUSTMENT
KNOB
FORCE INDICATOR
(Set to 5)
WELD HEAD
EZ-AIR
VALVE DRIVER CABLE
FIRING SWITCH CABLE
EMERGENCY
STOP
SWITCH
FOOT
SWITCH
REAR PANEL