Mechanically Actuated Weld Head Connection
(force fired Weld Head)
1.
Connect the weld head cables as noted on the previous page (Steps 1-4).
2.
Connect the weld head firing switch cable connector to the Power Supply firing switch cable
connector.
3.
Set the weld mode setting to the FSW selection.
4.
Connect a normally closed, agency compliant,
EMERGENCY STOP SWITCH
across the two leads
of the emergency stop switch connector cable. This switch, when operated (open), will
immediately stop the weld cycle and retract the weld head. See
Appendix B. Electrical and Data
Connections
for circuit details.
5.
Set the
ON/OFF
switch on the rear panel of the Power Supply to the
ON
position.
6.
Set the active schedule to the minimum energy level of the Power supply.
7.
Set the weldhead force to 5 units of force (or greater, as displayed on the force indicator index).
8.
Press the foot switch smoothly to close the weldhead. Verify that the power supply fires.
FORCE
ADJUSTMENT
KNOB
FORCE INDICATOR
(Set to 5)
FIRING
SWITCH
CABLE
EMERGENCY
STOP
SWITCH
WELD HEAD