02-10
2-5-3 Defrost Operation Control
Accumulated heating operation time is 40 minutes or longer
[Accumulated heating operation time is reset at the end of cooling operation or defrosting operation.]
and
an outdoor unit satisfies condition or below
Condition : "Heat exchange temperature -2°C" accumulated operating time is 180 minutes or longer
Condition : After the following all condition satisfied, "heat exchange temperature defrosting start judgment
temperature and during heat exchange liquid temperature drop" accumulated time:10minutes
(a) accumulated heating operation time 30 minutes
(b) 10 minutes have elapsed after outdoor unit starting
(c) 5 minutes have elapsed since oil recovery
* Defrosting start and end judgment temperature are determined by the outdoor temperature.
Defrosting start judgment temperature = 0.8 x outdoor temperature - 11.6 (However, -27.6°C to
- 6°C)
At all outdoor units, heat exchange liquid temperature end judgment temperature
or
when 10 minutes have elapsed from the start
(When the indoor unit connection capacity is 90% or less, after 15 minutes have elapsed.)
Defrosting end judgment temperature = 0.39 x outdoor tempe 12.7 (However, 5 to 12°C range)
If the calculated result is lower tha
n -27.6 , the judgment temperature is defined as -27.6
If the calculated result is higher tha
n -6 , the judgment temperature is defined as -6
2-5-2 Pre-heat Operation
This pre-heat operation protects the start up failure by preventing the refrigerant from soaking into the oil in compressor.
Crankcase heater ON: 30 minutes elapsed since installed compressors stopped (However, ON when power turned on)
*It doesn't control according to the temperature.
If the calculated result is lower tha
n 5 , the judgment temperature is defined as 5
If the calculated result is higher tha
n 12 , the judgment temperature is defined as 12
OFF: Compressor starts
Outdoor temperature <2 and Compressor stop count exceed 20 times at less than 10 minutes of accumulated
heating operation time
Defrost Operation Start Condition 1
Defrost Operation Start Condition 2
Defrost Operation End Condition
Summary of Contents for ARXB07LALH
Page 1: ...Small VRF system for light commercial and home use SERVICE MANUAL...
Page 2: ......
Page 6: ......
Page 7: ...1 TEST RUN...
Page 8: ......
Page 27: ...2 OUTDOOR UNIT OPERATION CONTROL...
Page 28: ......
Page 42: ......
Page 43: ...3 INDOOR UNIT OPERATION...
Page 44: ......
Page 63: ...4 TROUBLE SHOOTING...
Page 74: ......
Page 171: ...5 APPENDING DATA UNIT...
Page 172: ......
Page 174: ...05 02 5 2 WIRING DIAGRAM 5 2 1 Indoor Unit MODELS AUXB07 09 12 14 18 24LALH...
Page 175: ...05 03 MODELS AUXD18 24LALH AUXA30 36 45 54LALH...
Page 176: ...05 04 MODELS ARXB07 09 12 14 18LALH...
Page 177: ...05 05 MODEL ARXB24LATH MODELS ARXB30 36LATH...
Page 178: ...05 06 MODEL ARXB45LATH...
Page 179: ...05 07 MODEL ARXA24LATH MODELS ARXA30 36 45LATH...
Page 180: ...MODELS ARXC36 45LATH 05 08...
Page 181: ...05 09 MODELS ARXD07 09 12 14 18 24LATH...
Page 182: ...MODELS AB A12 14 18 24LBTH 05 10...
Page 183: ...05 11 MODELS AB A30 36 45 54LBTH...
Page 184: ...MODELS AS A07 09 12 14LACH 05 12...
Page 185: ...MODELS AS E07 09 12 14LACH 05 13...
Page 186: ...MODELS AS A18 24 30LACH 05 14...
Page 187: ...05 15 MODELS AJ A36 45 54LALH 5 2 2 Outdoor Unit...
Page 192: ......
Page 193: ...6 DISASSEMBLY PROCESS...
Page 194: ......