
Installation
NovoCyte Quanteon Flow Cytometer Operator's Guide
53
WARNING
To prevent accidents and to ensure the quality of the data, after Agilent
Technologies professionals install the instrument, moving the instrument is
not recommended. If any change of performance is observed, please contact
your local Agilent Technologies representative.
Install NovoCyte Quanteon
A complete and typical installation of NovoCyte Quanteon instrument requires
installation of instrument, workstation, monitor, and NovoCyte Fluidics Station II.
When NovoSampler Q or NovoCyte Fluidics Cart is purchased, user can refer to
associated operator's guide for associated installation procedures.
Figure 23 illustrates the typical connection of the NovoCyte Quanteon flow
cytometer system. Please follow the instructions below to install each component.
Figure 23.
NovoCyte Quanteon flow cytometer System Connection
Summary of Contents for NovoCyte Quanteon
Page 147: ......