![Agilent Technologies 1290 Infinity II 2D-LC Solution User Manual Download Page 81](http://html1.mh-extra.com/html/agilent-technologies/1290-infinity-ii-2d-lc-solution/1290-infinity-ii-2d-lc-solution_user-manual_2867575081.webp)
2D-LC User Guide
81
4
Installation
Hardware Installation
The
1
D/
2
D switching valve offers the possibility to exclude the
2
D flow path of the
instrument to run both
1
D and
2
D experiments which is useful for example if one
mass spectrometer is used for both
1
D and
2
D experiments. Two basic setups
are supported (setup E and F). The recommended setups for a
1
D/
2
D Switching
valves do not support the use of ICC column compartments, column switching
valves or the use of separate
1
D and
2
D MCTs/TCCs! To run 1D experiments, the
2
D mode must be disabled. This must be done in the UI of the 2D-LC Method
Editor, see
Number of
Capillary
#
Connection
L x ID [mm]
P/N
Description
D1
1
Capillary from
2
D detector to T-piece
0.12 x 400
5067-4606
Capillary ST 400x0.12 S/SH
D2
1
T-piece
0100-0969
1/16in Tee, SST, Low Dead
Volume
D3
1
Capillary from MS to T-piece (self cut)
0.12 x 400
0890-1915
Capillary PEEK, 0.12x1250
D4
2
T-piece to pressure relief valve;
pressure relief valve to diverter valve
0.3 x 80
5500-1228
Capillary ST 0.3x80 SL/SL
D5
1
Pressure relief valve
G4212-60022
Pressure relief valve
D6
1
blank nut
01080-83202
Blanking Nut 1/16 in SST
D7
1
diverter valve to waste
5062-2462
Tubing PTFE 0.7 mm x 5m
D8
1
peak fittings
5063-6591
Fitting-Fingertight PEEK for
1/16-in
D9
1
Valve holder for Valve drive to attach to
MCT
5067-6138
Valve Holder Kit Right-IF-II-G
D10
1
Diverter Valve
G4231A
G4231C
G4232A
G4232C
2pos/6port, 800bar
2pos/6port, 1300bar
2pos/10port, 800bar
2pos/10port, 1300bar
For all other capillaries / connections, please refer to