Figure 4-4: TAC Valve Adjust (Idle Screw)
4.5 REASSEMBLY AFTER COMBUSTION CALIBRATION
Once the combustion calibration adjustments are properly set, the unit can be reassembled for
service operation.
Reassembly
1. Set the
ON/OFF
switch in the
OFF
position.
2. Disconnect AC power from the unit.
3. Shut off the gas supply to the unit.
4. Remove the manometer and barbed fittings and reinstall the NPT plug using a suitable
pipe thread compound.
5. Remove the combustion analyzer probe from the 1/4” vent hole in the exhaust manifold.
Replace the 1/8” NPT plug in the manifold.
6. Replace all previously removed sheet metal enclosures on the unit.
TAC VALVE
IDLE SCREW