![Aerco BENCHMARK 6000 User Manual Download Page 50](http://html.mh-extra.com/html/aerco/benchmark-6000/benchmark-6000_user-manual_2861514050.webp)
Benchmark 6000 Boiler Installation, Operation & Maintenance Manual
CHAPTER 3 – OPERATION
Page
50
of
210
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0086_0D
03/20/14
Ph.: 800-526-0288
GF-133
Menu Item Display
Available Choices or Limits
Default
Minimum
Maximum
Err Threshold
1
9
5
SSD Temp Format
Degrees
Points
Degrees
BST Upld Timer
0
9999 sec
0
3.10 START SEQUENCE
When the Control Box
ON/OFF
switch is set to the
ON
position, it checks all pre-purge safety
switches to ensure they are closed. These switches include:
•
Downstream Safety Shut-Off Valve (SSOV) Proof of Closure (POC) switch
•
Low Water Level switch
•
High Water Temperature switch
•
High Gas Pressure switch
•
Low Gas Pressure switch
•
Blower Proof switch
•
Blocked Inlet switch
NOTE
The downstream Low Gas Pressure switch is
not
checked prior to
starting the pre-purge.
If all of the above switches are closed, the
READY
light above the
ON/OFF
switch will light and
the unit will be in the Standby mode.
When there is a demand for heat, the following events will occur:
NOTE
If any of the Pre-Purge safety device switches are open, the
appropriate fault message will be displayed. Also, if the required
conditions are not observed at any point during the start sequence,
appropriate messages will be displayed and the unit will go into
fault mode.
1.
The
DEMAND
LED status indicator will light.
2.
The unit checks to ensure that the Proof of Closure (POC) switch in the downstream Safety
Shut-Off Valve (SSOV) is closed. See Figure 3-3 for the downstream SSOV location.