Benchmark 6000 Boiler Installation, Operation & Maintenance Manual
CHAPTER 2 – INSTALLATION
Page
26
of
210
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
OMM-0086_0D
03/20/14
Ph.: 800-526-0288
GF-133
Figure 2-9: Power Box With Closed Cover
Figure 2-10: Power Box Internal Components
With the exception of the transformer shown in Figure 2-10, all of the components in the Power
Box are mounted on a DIN rail.
NOTE
All electrical conduit and hardware must be installed so that it does
not interfere with the removal of any unit covers, inhibit
service/maintenance, or prevent access between the unit and walls
or another unit.
Power Box,
located in the
unit’s upper-
right corner.
WIRE CONDUITS
POWER
BREAKER
TRANSFORMER
12V POWER
SUPPLY
FUSE BLOCKS (2)
TERMINAL BLOCKS
24V POWER
SUPPLY