Benchmark 6000 Boiler Installation, Operation & Maintenance Manual
CHAPTER 3 – OPERATION
OMM-0086_0D
AERCO International, Inc.
•
100 Oritani Dr.
•
Blauvelt, NY 10913
Page
51
of
210
GF-133
Ph.: 800-526-0288
03/20/14
Figure 3-3: SSOV Location
3.
With all required safety device switches closed, a purge cycle will be initiated and the
following events will occur:
a) The Blower relay energizes and turns on the blower.
b) The Air/Fuel Valve rotates to the full-open purge position and closes purge position
switch. The dial on the Air/Fuel Valve will read
100
(Figure 3-4) to indicate that it is
full-open (100%).
c) The
VALVE POSITION
bargraph will show 100%.
Figure 3-4: Air/Fuel Valve In Purge Position
STEPPER
MOTOR
TO BLOWER
100
AIR IN
DOWNSTREAM
SSOV WITH
POC SWITCH
TO AIR/FUEL
VALVE
GAS INLET
MANUAL SHUT-OFF VALVE
UPSTREAM
SSOV WITH POC &
AUX SWITCH