Snap Server and Expansion Array Hardware Checklists
Appendix C Your Snap Server 700i Series
193
Snap Server 720i Hardware Checklist
The following checklist shows the required and optional hardware to install a Snap
Server 720i, and indicates whether a component comes with the server or must be
supplied by the customer.
Component
Description
Network and
Power
;
Ethernet Cables (3 per enclosure)
Required to connect the Ethernet port(s) to the network.
;
Power Cables (3 per enclosure)
Required to plug into the mains (1 US, 1 UK, 1 EU).
Ethernet Switches
Use switches that support GbE.
APC-Brand UPS Device(s) (optional)
Snap Servers are designed to work with a USB-based or network-
based APC-brand UPS. Visit the
APC Web site
for a listing of optimal
APC models.
Rack
;
Slide Rail Assemblies (2 per enclosure)
Two (2) slide rails and screws for attaching the server to a rack.
32 inch/36 inch, Four-post Rack
You must use a 32-inch (or greater) four-post rack to mount this server.
Expansion
;
SAS Card
Required to connect to an S50 expansion array.
Summary of Contents for 5325302057 - Snap Server 750i NAS
Page 1: ...Snap Server 700i Series User s Guide for Adaptec OnTarget Powered Snap Servers ...
Page 6: ......
Page 12: ...6 Snap Server 700i User s Guide ...
Page 18: ...Finding More Information 12 Snap Server 700i Series User s Guide ...
Page 32: ...System Requirements 26 Snap Server 700i Series User s Guide ...
Page 82: ...Backing Up Your Data with Mirrored Volumes 76 Snap Server 700i Series User s Guide ...
Page 114: ...Updating the Adaptec OnTarget Operating System 108 Snap Server 700i Series User s Guide ...
Page 182: ...iSCSI Configuration for Solaris 176 Snap Server 700i Series User s Guide ...
Page 192: ...Getting Help 186 Snap Server 700i Series User s Guide ...
Page 210: ...Adaptec Storage Manager Feature Support by OS 204 Snap Server 700i Series User s Guide ...
Page 216: ...Example Command Line Installations 210 Snap Server 700i Series User s Guide ...