149
(3) Pull the stands from the server
(3)
.
3
Remove the inner rails from the mounting rails by following the
steps below:
Note:
The rack mount kit contains a bag of screws, two sets of
side handles, rack brackets and mounting rails. The side handles
are attached to the sides of the server. The rack brackets attach
the mounting rails to the server. The mounting rails allow the
server to slide in and out of the rackmount for maintenance
purposes. Each mounting rail consists of: inner rail, middle slide,
and fixed outer rail. The fixed outer piece is screwed onto the rack
bracket with a M4 x L8 metal screw and nut, an inner rail is
attached to the sides of the server with the #8-32 screws and an
middle sliding piece controlled by a steel ball gearing movement.
(1) Extend the inner rail from the mounting rail until the rail
release latch clicks.
Summary of Contents for Altos G710
Page 1: ...Acer Altos G710 User s Guide ...
Page 10: ...x Setting 183 Index 187 ...
Page 11: ...1 System tour ...
Page 35: ...2 System setup ...
Page 46: ...2 System setup 36 ...
Page 47: ...3 System upgrade ...
Page 69: ...59 2 Pull out the CPU from the socket 2 ...
Page 89: ...4 BIOS setup ...
Page 130: ...4 BIOS setup 120 ...
Page 131: ...5 Troubleshooting ...
Page 142: ...5 Troubleshooting 132 ...
Page 143: ...Appendix A System management ...
Page 151: ...Appendix B Acer Altos G710 rack installation guide ...
Page 152: ...This appendix shows you how to set up the Altos G710 server in a rack mount configuration ...
Page 167: ...Appendix C SCSI RAID configuration ...
Page 168: ...This appendix shows you how to create a RAID volume in your SCSI drives ...
Page 173: ...Appendix D ePanel ...
Page 196: ...Appendix D ePanel 186 ...