52
Energy (No
Time of Use,
only real-
time energy)
1~18
17
13701~13718
Phase C prior month total
energy, Phase C prior month
tariff 1energy, Phase C prior
month tariff2 energy.
#
18
13801~13818
Phase C prior month tariff 3
energy, Phase C prior month
tariff 4 energy
#
19
13901~13918
Total reactive energy
*
20
14001~14018 Phase A,B,C reactive energy
*
21
14101~14118
Total apparent energy
*
22
14201~14218 Phase A,B,C apparent energy
*
Demand
1~18
1
22101~22118
System active power demand,
System reactive power demand,
System apparent power
demand
2
22201~22218
Phase A,B,C active power
demand
3
22301~22318
Phase A Real Power Demand
prediction, Phase A Real Power
Demand Peak and happening
time
4
22401~22418
Phase B Real Power Demand
prediction, Phase B Real Power
Demand Peak and happening
time
5
22501~22518
Phase C Real Power Demand
prediction, Phase C Real Power
Demand Peak and happening
time
6
22601~22618
Phase A,B,C Reactive power
demand
*
Summary of Contents for AcuRev 2000
Page 1: ...User s Manual AcuRev 2000 Smart Metering System...
Page 2: ......
Page 8: ...VI...
Page 9: ...1 1 1 Meter Overview 1 2 Areas of Application 1 3 AcuRev 2000 features Chapter 1 Introduction...
Page 15: ...7 Chapter 2 Installation 2 1 Appearance and Dimensions 2 2 Installation Methods 2 3 Wiring...
Page 40: ...32...
Page 93: ...85 Figure 4 7 Demand...
Page 101: ...93 4 6 Over Under Limit Alarming Figure 4 13 Alarming in software...
Page 104: ...96 Figure 4 15 System Event Log 4 7 System Event Log...
Page 120: ...112 4 10 Device Information Figure 4 18 Device Information...
Page 152: ...144 Figure 5 18...
Page 158: ...150 Figure 5 23...