53
Demand
1~18
7
22701~22718
Phase A Reactive Power
Demand prediction, Phase A
Reactive Power Demand Peak
and happening time
*
8
22801~22818
Phase B Reactive Power
Demand prediction, Phase B
Reactive Power Demand Peak
and happening time
*
9
22901~22918
Phase C Reactive Power
Demand prediction, Phase C
Reactive Power Demand Peak
and happening time
*
10
23001~23018
Phase A,B,C Apparent power
demand
*
11
23101~23118
Phase A Apparent Power
Demand prediction, Phase A
Apparent Power Demand Peak
and happening time
*
12
23201~23218
Phase B Apparent Power
Demand prediction, Phase B
Apparent Power Demand Peak
and happening time
*
13
23301~23318
Phase C Apparent Power
Demand prediction, Phase C
Apparent Power Demand Peak
and happening time
*
14
23401~23418
Phase A,B,C Current demand
*
15
23501~23518
Phase A Current Demand
prediction, Phase A Current
Demand Peak and happening
time
*
Summary of Contents for AcuRev 2000
Page 1: ...User s Manual AcuRev 2000 Smart Metering System...
Page 2: ......
Page 8: ...VI...
Page 9: ...1 1 1 Meter Overview 1 2 Areas of Application 1 3 AcuRev 2000 features Chapter 1 Introduction...
Page 15: ...7 Chapter 2 Installation 2 1 Appearance and Dimensions 2 2 Installation Methods 2 3 Wiring...
Page 40: ...32...
Page 93: ...85 Figure 4 7 Demand...
Page 101: ...93 4 6 Over Under Limit Alarming Figure 4 13 Alarming in software...
Page 104: ...96 Figure 4 15 System Event Log 4 7 System Event Log...
Page 120: ...112 4 10 Device Information Figure 4 18 Device Information...
Page 152: ...144 Figure 5 18...
Page 158: ...150 Figure 5 23...