224
2FC7H-
2FEAH
Channel 17 demand
data
R
Same as phase A
demand 301-308
2FEBH-
300EH
Channel 18 demand
data
R
Same as phase A
demand 309-316
300FH-
3029H
Channel 1 3-phase
4-line/single-phase
3-line total demand
R
The same as to
inline system
demand(active
demand, reactive
power demand,
apparent demand)
317-322
302AH-
3044H
Channel 2 3-phase
4-line/single-phase
3-line total demand
R
The same as to
Channel 1 3-phase
4-line / single-phase
3-line 323-328
3045H-
305FH
Channel 3 3-phase
4-line/single-phase
3-line total demand
R
The same as to
Channel 1 3-phase
4-line / single-phase
3-line 329-334
3060H-
307AH
Channel 4 3-phase
4-line/single-phase
3-line total demand
R
The same as to
Channel 1 3-phase
4-line / single-phase
3-line 335-240
307BH-
3095H
Channel 5 3-phase
4-line/single-phase
3-line total demand
R
The same as to
Channel 1 3-phase
4-line / single-phase
3-line 341-346
3096H-
30B0H
Channel 6 3-phase
4-line/single-phase
3-line total demand
R
The same as to
Channel 1 3-phase
4-line / single-phase
3-line 347-352
Energy Quality
Summary of Contents for AcuRev 2000
Page 1: ...User s Manual AcuRev 2000 Smart Metering System...
Page 2: ......
Page 8: ...VI...
Page 9: ...1 1 1 Meter Overview 1 2 Areas of Application 1 3 AcuRev 2000 features Chapter 1 Introduction...
Page 15: ...7 Chapter 2 Installation 2 1 Appearance and Dimensions 2 2 Installation Methods 2 3 Wiring...
Page 40: ...32...
Page 93: ...85 Figure 4 7 Demand...
Page 101: ...93 4 6 Over Under Limit Alarming Figure 4 13 Alarming in software...
Page 104: ...96 Figure 4 15 System Event Log 4 7 System Event Log...
Page 120: ...112 4 10 Device Information Figure 4 18 Device Information...
Page 152: ...144 Figure 5 18...
Page 158: ...150 Figure 5 23...