Section 4
Unpacking and checking the IED
About this chapter
This chapter describes the delivery and the unpacking of the IED
4.1
Taking delivery, unpacking and checking
Procedure
1.
Remove the transport casing.
2.
Visually inspect the IED.
3.
Check that all items are included in accordance with the delivery documents.
Once the IED has been started make sure that the software functions ordered
have been included in the delivery.
4.
Check for transport damages.
If transport damage is discovered appropriate action must be taken against the
latest carrier and the nearest ABB office or representative should be
informed. ABB should be notified immediately if there are any discrepancies
in relation to the delivery documents.
5.
Storage
If the IED is to be stored before installation, this must be done in the original
transport casing in a dry and dust free place. Observe the environmental
requirements stated in the technical data.
1MRK 504 088-UEN C
Section 4
Unpacking and checking the IED
21
Installation and commissioning manual
Summary of Contents for RELION RET670
Page 1: ...Relion 670 series Transformer protection RET670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 82: ...76...
Page 88: ...82...
Page 94: ...88...
Page 104: ...98...
Page 110: ...104...
Page 210: ...204...
Page 230: ...224...
Page 239: ...233...