Table 7:
Designations for 1/1 x 19” casing with 2 TRM slots
IEC08000475 BG V1 EN
Module
Rear Positions
PSM
X11
BIM, BOM,
SOM, IOM or
MIM
X31 and X32 etc. to X131
and X132
BIM, BOM,
SOM, IOM, MIM
or GSM
X131, X132
SLM
X301:A, B, C, D
IRIG-B or LDCM
1,2)
X302
LDCM 2)
X303
OEM 4)
X311:A, B, C, D
RS485 or LDCM
2) 3)
X312
LDCM 2)
X313
LDCM 2)
X322
LDCM 2)
X323
TRM 1
X401
TRM 2
X411
1) IRIG-B installation, when included in seat P30:2
2) LDCM installation sequence: P31:2, P31:3,
P32:2, P32:3, P30:2 and P30:3
3) RS485 installation, when included in seat
P31:2, P31:3, P32:2 or P32:4
4) OEM X311:A, B (IEC 61850-8-1). OEM
X311:C, D
Note!
2-4 LDCM can be included depending of
availability of IRIG-B respective RS485 modules.
When IRIG-B, RS485 and 4 pc of LDCM are in
use, needs a second ADM.
1MRK 504 088-UEN C
Section 5
Installing the IED
49
Installation and commissioning manual
Summary of Contents for RELION RET670
Page 1: ...Relion 670 series Transformer protection RET670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 82: ...76...
Page 88: ...82...
Page 94: ...88...
Page 104: ...98...
Page 110: ...104...
Page 210: ...204...
Page 230: ...224...
Page 239: ...233...