1.
Check that the input logical signals BLOCK, CBOPEN and VTSU are logical
zero.
2.
Supply a three-phase rated voltage in all three phases and note on the local
HMI that the TRIP logical signal is equal to the logical 0.
3.
Switch off the voltage in all three phases.
After set
tTrip
time a TRIP signal appears on the corresponding binary output
or on the local HMI.
Note that TRIP at this time is a pulse signal, duration should
be according to set
tPulse
.
4.
Inject the measured voltages to their rated values for at least set
tRestore
time.
5.
Activate the CBOPEN binary input.
6.
Simultaneously disconnect all the three-phase voltages from the IED.
No TRIP signal should appear.
7.
Inject the measured voltages to their rated values for at least set
tRestore
time.
8.
Activate the VTSU binary input.
9.
Simultaneously disconnect all the three-phase voltages from the
tRestore
.
No TRIP signal should appear.
10. Reset the VTSU binary input.
11. Inject the measured voltages to their rated values for at least set
tRestore
time.
12. Activate the BLOCK binary input.
13. Simultaneously disconnect all the three-phase voltages from the terminal.
No TRIP signal should appear.
14. Reset the BLOCK binary input.
13.7.6.2
Completing the test
Continue to test another function or end the test by changing the
Test mode
setting
to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
13.8
Frequency protection
13.8.1
Underfrequency protection SAPTUF
Prepare the IED for verification of settings as outlined in section
and
section
in this chapter.
13.8.1.1
Verifying the settings
Verification of START value and time delay to operate
Section 13
1MRK 504 088-UEN C
Verifying settings by secondary injection
164
Installation and commissioning manual
Summary of Contents for RELION RET670
Page 1: ...Relion 670 series Transformer protection RET670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 82: ...76...
Page 88: ...82...
Page 94: ...88...
Page 104: ...98...
Page 110: ...104...
Page 210: ...204...
Page 230: ...224...
Page 239: ...233...